Archive:August 25, 2020

1
U.S. Army Corps Proposes Two New Nationwide Permits for Utility Lines and Revises Additional Nationwide Permits Impacting Utility-Scale Wind and Solar Infrastructure

U.S. Army Corps Proposes Two New Nationwide Permits for Utility Lines and Revises Additional Nationwide Permits Impacting Utility-Scale Wind and Solar Infrastructure

Authors: Ankur K. Tohan, Robert M. Smith, and Natalie J. Reid

The U.S. Army Corps of Engineers (USACE) has proposed revisions to its Nationwide Permits (NWPs) that will significantly change to how utility lines will be treated under the NWP program. Currently, only one NWP exists to address the construction of all utility lines: NWP 12. The USACE proposes to add two new utility line permits: NWP C: Electric Utility Line and Telecommunications Activities and NWP D: Utility Line Activities for Water and Other Substances. The USACE further intends to limit existing NWP 12 to only oil and natural gas activities. Finally, the USACE has proposed to further reduce the regulatory obstacles faced by wind and solar project developers by modifying additional NWPs.

The key changes relevant to wind and solar developments are the creation of NWP C, the elimination of many Pre-Construction Notification requirements, and the removal of the 300 linear foot limit for losses to stream bed in NWP 51. To read the full alert CLICK HERE.

Copyright © 2024, K&L Gates LLP. All Rights Reserved.